whole of
the line between the one to
auantemecu the Co voluntan
the 4th of December undertook to concute)
am
tivo tracks Stones them that
was
#oat
ly whi
the middle ship in consider
last messis Ligh
of being allowed to substitut
Orange
on
behalf of
a double hack centre port System for a double trai.
Comhome deposited side fora szolim
the beau
A
cross section
showing
double line
a
with centre potes and
a
space of 6ft
It 6 in
between the tracks, coured with couch to 6 in indepth a concrite bed bring
laid undercath
Each live of
Tramway
Extending 18 in outside
the rails
on sitter
side wherever the
Tramway
is laid
other
than
natural
ground 12
Construction was
ведит
o
472
the luies
of this cross section
which
was accepted
other remon icony
by the Gort parity
on
account of the
Company voluntarily
is stated,
undertaking, to
concrete
the whole of
the 6 ft 6 in between
the hacks. The
AA of PALKAL
Until this section was submitted it was inteword that the poles should be at the kerb
the tracks 4 feet apart, this 4 feet
being concated Miron and
maintained in good repair by the Company
No comments yet.
Private notes are available after approval.